What are the evaluation deadlines in each state?
Where there is a federal rule, it comes first. Each state follows with its rule, how it compares and its source.
Completing an initial evaluation
| State | The rule | Compared with federal law | Source |
|---|---|---|---|
| Federal rules | Under federal law, the school generally must finish your child’s initial evaluation within 60 calendar days after it receives your consent, unless your state sets its own timeline. This timeline doesn’t apply if you repeatedly don’t make your child available for the evaluation. It also doesn’t apply if your child changes districts mid-evaluation, the new district is making enough progress, and you and the new district agree on a finish date. For a suspected learning disability, you and the school’s group of qualified professionals can agree in writing to extend the timeline. | This is the federal rule. | |
| Alabama | In Alabama, the school must finish your child’s first evaluation within 60 calendar days. The day the school gets your signed consent form counts as day 1. School breaks and summer count. This timeline doesn’t apply if you repeatedly don’t make your child available for the evaluation. It also doesn’t apply if your child changes districts mid-evaluation, the new district is making enough progress, and you and the new district agree on a finish date. Work out your date for evaluation deadlines in Alabama | Alabama sets a different rule from the federal one. | |
| Alaska | In Alaska, the school has 90 calendar days after your consent to finish your child’s initial evaluation. If your child is eligible and you consent to services, the IEP must also be developed and services provided within those same 90 days. You can ask the school to tell you its due date. Work out your date for evaluation deadlines in Alaska | Alaska sets a different rule from the federal one. | |
| Arizona | In Arizona, the school must finish your child’s initial evaluation within 60 calendar days after it receives your informed written consent. In that time, the multidisciplinary evaluation team (MET) must also decide eligibility. Getting a report doesn’t by itself mean that decision was made. The school can take 30 more days only if you both agree in writing and it’s in your child’s best interest. Work out your date for evaluation deadlines in Arizona | Arizona sets a different rule from the federal one. | |
| Arkansas | Under federal law, the school generally must finish your child’s initial evaluation within 60 calendar days after it receives your consent, unless your state sets its own timeline. This timeline doesn’t apply if you repeatedly don’t make your child available for the evaluation. It also doesn’t apply if your child changes districts mid-evaluation, the new district is making enough progress, and you and the new district agree on a finish date. For a suspected learning disability, you and the school’s group of qualified professionals can agree in writing to extend the timeline. Work out your date for evaluation deadlines in Arkansas | The federal rule applies in Arkansas. | |
| California | In California, your child’s first IEP must be developed within 60 days after the school district receives your signed consent for assessment. Days between regular school sessions or terms, and school vacations longer than five school days, don’t count. You can agree in writing to more time. If the written referral was made 30 days or less before the regular school year ended, a different deadline applies. The IEP is then due within 30 calendar days after the next regular school year starts. That date depends on the referral date, not your consent date, and the break exclusions don’t apply to those 30 days. | California sets a different rule from the federal one. | |
| Colorado | Under federal law, the school generally must finish your child’s initial evaluation within 60 calendar days after it receives your consent, unless your state sets its own timeline. This timeline doesn’t apply if you repeatedly don’t make your child available for the evaluation. It also doesn’t apply if your child changes districts mid-evaluation, the new district is making enough progress, and you and the new district agree on a finish date. For a suspected learning disability, you and the school’s group of qualified professionals can agree in writing to extend the timeline. Work out your date for evaluation deadlines in Colorado | The federal rule applies in Colorado. | |
| Connecticut | In Connecticut, the timeline usually runs 45 school days after the district receives a written referral. The referral-receipt day is not counted. It covers the evaluation, the eligibility decision and, if your child is eligible, putting the IEP in place. If the IEP calls for an out-of-district or private placement, it’s 60 school days. A referral between school years may have a district-deemed effective date on the first school day of the next year.
| Connecticut sets a different rule from the federal one. | |
| Delaware | In Delaware, the initial evaluation and the eligibility meeting must happen within 45 school days or 90 calendar days after the school receives your written consent, whichever comes first. | Delaware sets a different rule from the federal one. | |
| District of Columbia | Under federal law, the school generally must finish your child’s initial evaluation within 60 calendar days after it receives your consent, unless your state sets its own timeline. This timeline doesn’t apply if you repeatedly don’t make your child available for the evaluation. It also doesn’t apply if your child changes districts mid-evaluation, the new district is making enough progress, and you and the new district agree on a finish date. For a suspected learning disability, you and the school’s group of qualified professionals can agree in writing to extend the timeline. Work out your date for evaluation deadlines in District of Columbia | The federal rule applies in District of Columbia. | |
| Florida | In Florida, the initial evaluation must be finished within 60 calendar days after the school district receives your consent. Some days don’t count, like school holidays, school breaks and summer vacation. The first 8 school days your child is absent still count. The Florida Department of Education says only absences beyond those 8 are left out. You and the school can agree in writing to up to 30 more days. You need to agree before day 45, after testing has started and the school finds it needs more evaluators. The 60 days don’t apply if you repeatedly don’t make your child available for the evaluation.
| Florida sets a different rule from the federal one. | |
| Georgia | In Georgia, the initial evaluation must be finished within 60 calendar days after the school district receives your written consent. Some school breaks don’t count. Summer vacation doesn’t count if the school gets your consent less than 30 days before the school year ends. If it gets your consent earlier, summer days count. The day the school gets your consent counts as day 1. If it arrives during summer or a break that doesn’t count, day 1 is the first school day after the break. If your child turns 3 during summer or another school break, the eligibility decision and the IEP, if needed, must be in place by the third birthday.
| Georgia adds to the federal rule. | |
| Hawaii | Under federal law, the school generally must finish your child’s initial evaluation within 60 calendar days after it receives your consent, unless your state sets its own timeline. This timeline doesn’t apply if you repeatedly don’t make your child available for the evaluation. It also doesn’t apply if your child changes districts mid-evaluation, the new district is making enough progress, and you and the new district agree on a finish date. For a suspected learning disability, you and the school’s group of qualified professionals can agree in writing to extend the timeline. Work out your date for evaluation deadlines in Hawaii | The federal rule applies in Hawaii. | |
| Idaho | In Idaho, no more than 45 school days can pass from when the school receives your written consent for the initial evaluation to the eligibility decision. This applies under the state manual that took effect July 1, 2026. Getting an evaluation report isn’t the same as the eligibility decision.
| Idaho adds to the federal rule. | |
| Illinois | In Illinois, the school must finish the evaluation, decide eligibility and hold the IEP meeting within 60 school days after you sign consent. If fewer than 60 school days are left in the school year after you sign, it must do all of this before the next school year starts. | Illinois sets a different rule from the federal one. | |
| Indiana | In Indiana, the initial evaluation must be done and the case conference committee (CCC) must meet within 50 instructional days after licensed school staff receive your written consent. Different rules apply for children moving from early intervention (Part C), if you repeatedly don’t make your child available, or after certain moves to a new district. | Indiana sets a different rule from the federal one. | |
| Iowa | Iowa uses the same 60 calendar days as federal law. The initial evaluation must be done within 60 calendar days after the school receives your consent. | Iowa follows the federal rule. | |
| Kansas | In Kansas, a 60-school-day timeline starts when the school receives your written consent. Within it, the evaluation must be done and the team must meet to decide eligibility and, if your child is eligible, develop the IEP. Where it applies, the IEP must also be put in place within that time. A separate 30-calendar-day deadline also applies to developing the IEP. | Kansas sets a different rule from the federal one. | |
| Kentucky | In Kentucky, within 60 school days after the school receives your consent for the initial evaluation, your child must be evaluated and, if eligible, receive services under an IEP. The 60-school-day timeline doesn’t apply if you repeatedly don’t make your child available for the evaluation. It also doesn’t apply if your child changes districts mid-evaluation, the new district is making enough progress, and you and the new district agree on a finish date. | Kentucky sets a different rule from the federal one. | |
| Louisiana | In Louisiana, the initial evaluation generally must be finished within 60 business days after the school receives your consent for evaluation. Business days are Monday through Friday, not counting federal and state holidays. | Louisiana sets a different rule from the federal one. | |
| Maine | In Maine, for a child 5 or older whose public school district is doing the evaluation, the evaluation and the eligibility decision must happen within 45 school days. The 45 school days start after the school district gets your consent. If Child Development Services (CDS) is doing the evaluation, it has 60 calendar days after it gets your consent. A school district also has 60 calendar days when it gets your consent before the school year starts, for a child moving from CDS into kindergarten. | Maine sets a different rule from the federal one. | |
| Maryland | In Maryland, the initial evaluation must be finished within 60 days of your consent to assessment and within 90 days after the school receives a written referral, whichever comes first. To do that, add the day the school got your written referral to your evaluation request. | Maryland sets a different rule from the federal one. | |
| Massachusetts | In Massachusetts, the initial evaluation generally must be finished within 30 school working days after the school receives your consent. You can check the school calendar and any exception in the rule. | Massachusetts sets a different rule from the federal one. | |
| Michigan | In Michigan, for a child you placed in a private school, the public school district must decide eligibility and give you notice within 30 school days. The 30 school days start after the district gets your written consent for the evaluation. You and the district can agree in writing to more time, counted in school days. For a public-school student, a different 30-school-day timeline applies. It ends with a notice offering a free appropriate public education (FAPE) or saying your child isn’t eligible. | Michigan sets a different rule from the federal one. | |
| Minnesota | In Minnesota, the initial evaluation generally must be finished within a reasonable time, and no more than 30 school days after the district receives your permission. The 30-school-day limit doesn’t apply if a conciliation conference or a due process hearing is requested. | Minnesota sets a different rule from the federal one. | |
| Mississippi | In Mississippi, the initial evaluation must be finished within 60 calendar days after the school receives your consent. You can check the due date with the school. Work out your date for evaluation deadlines in Mississippi | Mississippi sets a different rule from the federal one. | |
| Missouri | In Missouri, the school must finish your child’s evaluation and decide eligibility within 60 calendar days after your consent. Before that, the school must give you a Notice of Intent to Evaluate within 30 calendar days after a referral.
| Missouri sets a different rule from the federal one. | |
| Montana | Under federal law, the school generally must finish your child’s initial evaluation within 60 calendar days after it receives your consent, unless your state sets its own timeline. This timeline doesn’t apply if you repeatedly don’t make your child available for the evaluation. It also doesn’t apply if your child changes districts mid-evaluation, the new district is making enough progress, and you and the new district agree on a finish date. For a suspected learning disability, you and the school’s group of qualified professionals can agree in writing to extend the timeline. Work out your date for evaluation deadlines in Montana | The federal rule applies in Montana. | |
| Nebraska | In Nebraska, the initial evaluation has two clocks: 45 school days after your consent, and an outside limit of 60 calendar days. Whichever comes first controls, according to the state education department’s guidance and a 2023 agency decision. Summer and other school breaks don’t stop the 60-calendar-day clock. Neither clock applies if you repeatedly don’t make your child available for the evaluation. The clocks also don’t apply if your child changes districts mid-evaluation, the new district is making enough progress, and you and the new district agree on a finish date.
| Nebraska sets a different rule from the federal one. | |
| Nevada | In Nevada, the initial evaluation usually must be finished within 45 school days after you give informed written consent. A hearing officer’s decision, or a shorter period it sets, can change that timing. So can a different written agreement between you and the school, or a Superintendent’s extension of up to 15 school days. | Nevada sets a different rule from the federal one. | |
| New Hampshire | In New Hampshire, the whole initial evaluation process must be finished within 60 calendar days after the school receives your consent. That includes the evaluations and assessments, a written summary report, and an IEP team meeting to review the results. If that meeting decides eligibility, the eligibility decision is included too.
| New Hampshire sets a different rule from the federal one. | |
| New Jersey | In New Jersey, a 90-calendar-day period starts when the school receives your written consent. Within it, the evaluation and eligibility decision must be done. If your child is eligible, the IEP must also be developed and put in place. Work out your date for evaluation deadlines in New Jersey | New Jersey sets a different rule from the federal one. | |
| New Mexico | In New Mexico, the initial evaluation and the written evaluation report must be finished within 60 calendar days after the school receives your consent. The eligibility meeting has its own 15-school-day period. You can ask the school which timeline applies. Work out your date for evaluation deadlines in New Mexico | New Mexico fills in a detail the federal rule leaves to states. | |
| New York | In New York, for a school-age child, the initial evaluation usually must be finished within 60 calendar days after the district receives your consent. Finishing the evaluation is a separate step from deciding eligibility, developing the IEP and starting services.
| New York fills in a detail the federal rule leaves to states. | |
| North Carolina | In North Carolina, the school has 90 calendar days after it receives a written referral. In that time, it must evaluate your child, decide eligibility and, if your child is eligible, develop the IEP and complete placement. It’s one combined timeline, not 90 days just for the evaluation. You can add that day to your evaluation request.
| North Carolina sets a different rule from the federal one. | |
| North Dakota | In North Dakota, the district must evaluate your child within 60 calendar days after your consent. A documented extreme-weather interruption, or limited access to a qualified evaluator that the state department accepts, can extend that time, but never past 90 calendar days in total.
| North Dakota sets a different rule from the federal one. | |
| Ohio | Under federal law, the school generally must finish your child’s initial evaluation within 60 calendar days after it receives your consent, unless your state sets its own timeline. This timeline doesn’t apply if you repeatedly don’t make your child available for the evaluation. It also doesn’t apply if your child changes districts mid-evaluation, the new district is making enough progress, and you and the new district agree on a finish date. For a suspected learning disability, you and the school’s group of qualified professionals can agree in writing to extend the timeline. Work out your date for evaluation deadlines in Ohio | The federal rule applies in Ohio. | |
| Oklahoma | In Oklahoma, the school usually has 45 school days to decide if your child is eligible for special education. The time ends on the day the team makes its decision on the MEEGS form. If the school got your signed consent form before November 1, 2026, the count starts on the day you signed. If the school got it on or after November 1, 2026, the count starts the day after the school got it. Qualifying virtual and partial instructional days count. | Oklahoma sets a different rule from the federal one. | |
| Oregon | In Oregon, the initial evaluation must be completed within 60 school days, counted from your written consent to the date of the meeting to consider eligibility. You can check the district calendar, the exceptions in the rule, and the school’s stated due date. | Oregon sets a different rule from the federal one. | |
| Pennsylvania | In Pennsylvania, the school generally must finish your child’s first evaluation and give you a copy of the report within 60 calendar days after it receives your written consent. Summer break doesn’t count: the days from the day after the last day of the spring term through the day before the fall term starts. | Pennsylvania sets a different rule from the federal one. | |
| Rhode Island | Rhode Island gives the school 63 calendar days from consent receipt to finish the initial evaluation, share the report and decide eligibility. A state law changed this from 60 to 63 days on July 1, 2026. The law doesn’t say how the change applies to an evaluation already under way on that date. For meetings on or after July 1, 2026, the parent must receive evaluation reports and relevant written materials, including drafted IEP goals and objectives, at least 3 calendar days before an eligibility or IEP meeting, unless the parent agrees to less time for scheduling needs. | Rhode Island sets a different rule from the federal one. | |
| South Carolina | Under federal law, the school generally must finish your child’s initial evaluation within 60 calendar days after it receives your consent, unless your state sets its own timeline. This timeline doesn’t apply if you repeatedly don’t make your child available for the evaluation. It also doesn’t apply if your child changes districts mid-evaluation, the new district is making enough progress, and you and the new district agree on a finish date. For a suspected learning disability, you and the school’s group of qualified professionals can agree in writing to extend the timeline. Work out your date for evaluation deadlines in South Carolina | The federal rule applies in South Carolina. | |
| South Dakota | In South Dakota, the initial evaluation must be finished within 25 school days after the school receives your signed consent, unless an exception applies. The day the school receives your consent isn’t counted. The next school day is day 1.
| South Dakota sets a different rule from the federal one. | |
| Tennessee | In Tennessee, the school must finish the initial evaluation and decide eligibility within 60 calendar days after it receives your consent. The first IEP meeting is a separate step, due within 30 calendar days after your child is found eligible. The 60 days don’t apply if you repeatedly don’t make your child available for the evaluation, or if your child changes districts mid-evaluation, the new district is making enough progress, and you and the new district agree on a finish date. Work out your date for evaluation deadlines in Tennessee | Tennessee sets a different rule from the federal one. | |
| Texas | In Texas, the school has 45 school days after it receives your written consent to finish the evaluation report. If your child misses 3 or more school days during that period, the deadline moves later by that many school days. If your child goes to a private school or is homeschooled, or was under 5 on September 1 and isn’t in public school, absences don’t move the deadline. If the school got your consent 35 to 44 school days before the last day of classes, the report is due June 30 instead, unless your child was absent 3 or more school days between then and the last day of classes.
| Texas sets a different rule from the federal one. | |
| Utah | In Utah, the initial evaluation usually must be finished within 45 school days after the school receives your consent. A different 30-day rule applies when Utah’s Division of Child and Family Services (DCFS) asks for the evaluation. | Utah sets a different rule from the federal one. | |
| Vermont | Under federal law, the school generally must finish your child’s initial evaluation within 60 calendar days after it receives your consent, unless your state sets its own timeline. This timeline doesn’t apply if you repeatedly don’t make your child available for the evaluation. It also doesn’t apply if your child changes districts mid-evaluation, the new district is making enough progress, and you and the new district agree on a finish date. For a suspected learning disability, you and the school’s group of qualified professionals can agree in writing to extend the timeline. Work out your date for evaluation deadlines in Vermont | The federal rule applies in Vermont. | |
| Virginia | In Virginia, the evaluation and the eligibility decision generally must be finished within 65 business days after the school division’s special education administrator, or someone they designate, receives the referral. The clock starts when the referral is received, not when you give consent. You can add that day to your evaluation request.
| Virginia sets a different rule from the federal one. | |
| Washington | In Washington, this applies if the district received your written consent on or after June 11, 2026. The evaluation and a report you can keep usually must be done by the 35th school day. The eligibility meeting is separate: at least five school days after you get the report, and no later than the 40th school day after consent. A specific, voluntary written waiver can change the five-day review time. The 40-day meeting limit can change if you agree to a later date and the district documents why. It also doesn’t apply if you repeatedly don’t make your child available, or if your child changes districts mid-evaluation, the new district is making enough progress, and you agree on a finish date. | Washington fills in a detail the federal rule leaves to states. | |
| West Virginia | In West Virginia, the evaluation and the eligibility meeting generally must happen within 80 calendar days after the school receives your written consent. Summer break doesn’t count. If schools close because of a state of emergency declared by the Governor, the timeline is extended by the length of that state of emergency. Days the school was closed for bad weather don’t count either, unless remote learning was offered on those days.
| West Virginia sets a different rule from the federal one. | |
| Wisconsin | In Wisconsin, the school must decide eligibility within 60 days. The 60 days start when it receives your consent for the evaluation, or when it gives you notice that no more evaluation information is needed. Work out your date for evaluation deadlines in Wisconsin | Wisconsin sets a different rule from the federal one. | |
| Wyoming | Under federal law, the school generally must finish your child’s initial evaluation within 60 calendar days after it receives your consent, unless your state sets its own timeline. This timeline doesn’t apply if you repeatedly don’t make your child available for the evaluation. It also doesn’t apply if your child changes districts mid-evaluation, the new district is making enough progress, and you and the new district agree on a finish date. For a suspected learning disability, you and the school’s group of qualified professionals can agree in writing to extend the timeline. Work out your date for evaluation deadlines in Wyoming | The federal rule applies in Wyoming. |
Responding to an evaluation request
| State | The rule | Compared with federal law | Source |
|---|---|---|---|
| Federal rules | Federal law does not set a fixed number of days to respond to an evaluation request. The U.S. Department of Education’s longstanding position is that the school must seek consent within a reasonable time if it agrees an evaluation is needed. If it refuses, federal regulations require prior written notice explaining why.
| This is the federal rule. | |
| Arizona | Within a reasonable time, no more than fifteen school days after receiving your written evaluation request, the school must either start by reviewing existing information or give written notice explaining its refusal. | Arizona adds to the federal rule. | |
| Arkansas | In Arkansas, within 7 calendar days after the school receives a written referral, it must schedule a referral conference at a time and place agreed with you and send you written notice of the referral and the conference. Work out your date for evaluation deadlines in Arkansas | Arkansas adds to the federal rule. | |
| California | In California, if the school will assess your child, it must give you a written assessment plan within 15 days after it receives the referral for assessment. Days between your child’s regular school sessions or terms, and school vacations longer than five school days, aren’t counted. If you agree in writing to an extension, the school can take longer. If the referral is made 10 days or less before the end of the regular school year, the plan must be developed within 10 days after the next regular school year or your child’s regular school term starts. | California adds to the federal rule. | |
| Connecticut | The school must send you written notice within five school days after your child’s evaluation referral. | Connecticut adds to the federal rule. | |
| District of Columbia | The school must make reasonable efforts to obtain your consent within thirty days after an evaluation referral and must document an oral referral within three business days. | District of Columbia adds to the federal rule. | |
| Florida | Within thirty days of your evaluation request, the school must obtain your consent to evaluate or give you a written refusal unless you and the school agree otherwise in writing. | Florida adds to the federal rule. | |
| Hawaii | Within fifteen days after the school receives your evaluation request, you must receive either a written proposal and request for consent or a written refusal, along with a notice of your rights. | Hawaii adds to the federal rule. | |
| Illinois | Within fourteen school days after receiving an evaluation request, the school must tell you whether it will evaluate your child and request your consent if assessments are needed. | Illinois adds to the federal rule. | |
| Indiana | Within ten instructional days after you request an evaluation from licensed school staff, verbally or in writing, the school must give written notice of its proposal or refusal. | Indiana adds to the federal rule. | |
| Louisiana | Within ten business days after pupil appraisal receives a referral, the evaluation coordinator must request any needed consent and tell you the evaluation concerns and proposed assessments. | Louisiana adds to the federal rule. | |
| Maine | If additional evaluations are needed after a referral, a school administrative unit must send a consent form within fifteen school days of receipt. An intermediate educational unit serving young children has fifteen days, rather than fifteen school days. | Maine adds to the federal rule. | |
| Massachusetts | Within five school days after receiving an evaluation referral, the school must send you written notice. | Massachusetts adds to the federal rule. | |
| Michigan | In Michigan, if your child attends a public school and you ask in writing for an initial evaluation, the school has 10 school days after it receives your request to give you written notice and ask for your written consent to evaluate. | Michigan adds to the federal rule. | |
| Mississippi | The school’s evaluation team must meet and decide whether to evaluate within fourteen calendar days of your verbal or written request, counting the request day as day one. It must give you written notice within seven calendar days after that meeting. | Mississippi adds to the federal rule. | |
| Missouri | In Missouri, the school must give you a Notice of Intent to Evaluate as soon as possible, but within 30 calendar days of the referral for evaluation. The school can take longer for a good reason, like a summer or holiday break or your child’s illness, if it writes the reason in your child’s record. If the school refuses your request for an evaluation, it must give you a Notice of Action Refused. Work out your date for evaluation deadlines in Missouri | Missouri adds to the federal rule. | |
| New Hampshire | In New Hampshire, when the school gets a referral, it must tell you in writing right away. Within 15 business days of the referral, the IEP team must decide how to respond to it and give you written notice of its decision. Business days are Monday through Friday, except federal and New Hampshire state holidays. | New Hampshire adds to the federal rule. | |
| New Jersey | Within twenty calendar days after receiving your written evaluation request, the school must meet with you to decide whether an evaluation is needed; school holidays do not count, but summer vacation does. | New Jersey adds to the federal rule. | |
| New Mexico | The school must respond to your evaluation request within fifteen school days, or within thirty calendar days if it arrives within fifteen school days before a scheduled break of at least fourteen calendar days. | New Mexico adds to the federal rule. | |
| New York | The special education committee chairperson must notify you immediately upon receiving your child’s evaluation referral. | New York adds to the federal rule. | |
| Ohio | Within thirty calendar days after receiving an evaluation request, the school must either obtain your consent to evaluate or give written notice that it does not suspect a disability and will not evaluate. | Ohio adds to the federal rule. | |
| Oklahoma | The school must review existing information as soon as possible after your evaluation request and, if it will evaluate, obtain your consent within ten school days after completing that review. | Oklahoma adds to the federal rule. | |
| Pennsylvania | If you request an evaluation orally from a school professional or administrator, that person must give you the permission-to-evaluate form within ten calendar days. | Pennsylvania adds to the federal rule. | |
| Rhode Island | In Rhode Island, within 10 school days after the school receives a referral for special education, the evaluation team, which includes you, must meet to decide whether your child needs a special education evaluation. | Rhode Island adds to the federal rule. | |
| Texas | In Texas, you can ask the school in writing to do an initial special education evaluation of your child. The school must answer in writing within 15 school days after the district receives the request. This covers a request sent to the district’s director of special education services or to a district administrative employee, such as a campus principal. The answer must either propose the evaluation and give you a chance to consent in writing, or refuse and explain why.
| Texas sets a different rule from the federal one. | |
| Vermont | Within fifteen calendar days after receiving your evaluation request, the school must request your consent, hold an evaluation planning meeting or give written reasons for denying the request. | Vermont adds to the federal rule. | |
| Virginia | Within three business days after the special education administrator receives a referral, the administrator must begin the evaluation process, direct a school-team review or deny the request. If referred to the school team, that team must meet within ten business days after it receives the referral. | Virginia adds to the federal rule. | |
| Washington | The school must decide whether to evaluate your child within 20 school days after it receives your written request, and give you written notice. A request must be in writing unless the person making it is unable to write. Separate deadlines apply to referrals from infant-and-toddler early intervention. | Washington adds to the federal rule. | |
| West Virginia | Within ten school days after receiving a written referral for special education evaluation, the school assistance team must review it and decide on further action. If it agrees to evaluate, it must provide written notice and request your consent within five days of its decision. If it refuses a written parent request for an initial evaluation, it must provide written notice within five days of that decision. | West Virginia adds to the federal rule. | |
| Wisconsin | Within fifteen business days after receiving your child’s referral, the school must review existing information and request consent for more assessments or tell you none are needed. | Wisconsin adds to the federal rule. |
Next step
If you want to ask the school in writing, this free letter is ready to copy and fill in.